Maintain proper access to the work area throughout the working period. Make sure that all plant and equipment are having back-up alarms, lights, and all other applicable safety devices. This induction talk will include both activity safety issues, as well as general safety requirements. Prior to the commencement of any activities, the workforce will receive an induction talk on the project site safety requirements. HSE officer will enforce that site personnel are using Personal Protective Equipment (such as Respiratory mask, Safety Shoes, Face mask, Hard hats, etc.) at all times during construction activities. If there are existing services, obtain the necessary work permits and provide safety equipment prior to the activity commencement. This may include barriers, warning tape/ net, signage, watchman, and Possible hazards may arise from filling activities, take the necessary safety measures to prevent accident or injury at all times. Implement the requirements of road works project safety plan procedures strictly. Occupational Health & Safety Requirements During Road Marking Works Retro reflectometers & Skid resistance testers. Post-Application Measuring Equipment: Non-destructive eddy current device such as the Elcometer and steel test plates for dry film thickness.Paint pressure and / or hydraulic/air pressure gauges Applicator speedometers, calibrated over range of applicator speedsĥ.

Electronic scales / bead bucket and stop watch for glass bead application rateĤ. Portable environmental measuring devices for temperature & humidityģ.

The major equipment for this construction works includes, but are not limited to the followings ġ. Plant & Equipment for Road Markings Activity Cleaning Cloths, Roller Brushes, Paint Brushes, Permanent Tapes, fine emery papers, etc.Arrange following materials and tools before start of the road markings works.